![]() 2016 to June 2017, cycles 305 to 327), Jason-1 (after february 2009) and Topex/Poseidon (after September 2002) , ![]() Interlaced orbit: Jason-3 (since April 25th 2022), Jason-2 (from Oct.Topex/Poseidon, Jason-1/2/3 (once moved from the reference orbit) The combined use of these two files allows the computation of CFOSAT passes over dates and times, within five to ten minutes’ precision, which should be sufficient for product selection or for campaign preparation. Download the user manual with the Google Earth CFOSAT file and the txt file giving the UTC starting dates of each cycle.Use Google Earth to check a pass number for: CFOSAT: Altimetry and Doris applications in videos. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |